logo-loader
Musgrave Minerals Ltd

Musgrave Minerals hits 45 metres at 11.8 g/t gold in new link area of Cue project

Follow-up drilling of possible link-lodes at Break of Day is planned for Q1 2020 leading towards a resource update in Q2 2020.

Musgrave Minerals Ltd - Musgrave Minerals intersects new high-grade link-lode at Cue Gold Project
Remaining RC assays and re-assays of 6 metre composite samples are expected in mid-December

Musgrave Minerals Ltd (ASX:MGV) has hit a new high-grade link-lode in drilling at Break of Day within the Cue Gold Project in Western Australia, including an intersection of 45 metres at 11.8 g/t gold.

A reverse circulation (RC) program of six holes for 786 metres has intersected high-grade gold in a ‘link’ position joining the two main Twilight and Velvet gold lodes at Break of Day.

This program has extended high-grade gold mineralisation to the south and has the potential to add upside to the high-grade Break of Day gold resource.

As well as the 45-metre intersection from 144 metres, drill hole 19MORC037 intersected 23 metres at 16.2 g/t from 166 metres.

Within the 45-metre hit was 11 metres at 14.0 g/t from 144 metres which, in turn, included 5 metres at 29.2 g/t from 150 metres.

Cross-section at Break of Day showing the new high-grade link-lode

Managing director Rob Waugh said: “Drill hole 19MORC037 was drilled to test a new hypothesis and structural interpretation and is a fantastic high-grade result for Break of Day on intersecting a potential new link-lode.

“This result opens numerous possibilities and opportunities to discover additional lodes and grow the Break of Day resource.

“Break of Day continues to deliver consistent high-grades and a few nice surprises.”

Shares have been up as much as 15% to an intra-day high of 9.2 cents, up from 6.8 cents on November 26.

Drill hole 19MORC037 was drilled to confirm a high-grade thicker section of the Break of Day system as well as to test a new structural interpretation and identified a quartz linking structure and gold lode.

Hole 19MORC031 was drilled 35 metres south of 19MORC015 and returned a high-grade result of 6 metres at 5.6 g/t from 126 metres in 6-metre composite samples.

Another hole, 19MORC033, intersected 2 metres at 3.3 g/t and showed the mineralisation continues at depth and is plunging to the south.

Individual one-metre samples from anomalous 6-metre composite intervals have been submitted for analysis.

Looking ahead 

Additional follow-up drilling is being planned and will be scheduled for Q1 2020 which will lead to a resource update in Q2 2020.

A detailed 3D analysis is also underway for Break of Day to help define the potential for additional possible link positions.

Quick facts: Musgrave Minerals Ltd

Price: 0.097 AUD

Market: ASX
Market Cap: $39.32 m
Follow

NO INVESTMENT ADVICE

The Company is a publisher. You understand and agree that no content published on the Site constitutes a recommendation that any particular security, portfolio of securities, transaction, or investment strategy is...

In exchange for publishing services rendered by the Company on behalf of Musgrave Minerals Ltd named herein, including the promotion by the Company of Musgrave Minerals Ltd in any Content on the Site, the Company...

FOR OUR FULL DISCLAIMER CLICK HERE

Watch

Musgrave Minerals intersects broad high-grade gold at Break of Day within...

Musgrave Minerals Ltd (ASX:MGV) managing director Rob Waugh updates Proactive on further broad high-grade gold results from RC drilling at the Break of Day deposit of the flagship Cue Gold Project in WA. The managing director said the high-grade gold had been intersected in a ‘link’ position...

2 days, 20 hours ago

3 min read